City Centre Façade Retention

Aerial view of g1 building glasgow with temporary works steel propping positioned around the perimeter of the building. Large general advertising banner positioned to front of the building showing a Nike advert.

Colemans designed and installed temporary works to retain a façade to a Grade A listed building located in Glasgow city centre’s busy commercial district

Deconstruction at Waterloo International Station

Image of deconstruction site at Waterloo international train station in London. Image shows work in progress on one side of a long hoarding including chapter 8 barriers and workers in safety clothing. The other side of the hoarding shows public walking through the busy train station.

As part of the £600million regeneration of Waterloo International Terminal, Colemans delivered a complex project within some of the most challenging site restrictions we have ever encountered.