City Centre Façade Retention

Aerial view of g1 building glasgow with temporary works steel propping positioned around the perimeter of the building. Large general advertising banner positioned to front of the building showing a Nike advert.

Colemans designed and installed temporary works to retain a façade to a Grade A listed building located in Glasgow city centre’s busy commercial district

Specialist Cutting Birmingham City Centre

image of worker on a scissor lift on a demolition site. Worker is wearing safety gear. Birmingham BT Tower is in the background.

Colemans were engaged by BAM to facilitate the complex cutting, hydro demolition, robotic demolition and traditional demolition within a five-storey below ground structure.

Motorway Bridge Deconstruction & Demolition

Night working scene on a motorway bridge removal job. Hot cutting works are being carried out on one end of the bridge.

Colemans showed our bridge demolition expertise to complete the removal of the A404 (M) motorway bridge over Great Western Railway high speed four track, whilst maintaining the flow of motorway traffic and ensuring minimal disruption to Network Rail’s operations.