Birmingham New Street Phase 2: Enhanced Project Delivery through Early Consultancy

Birmingham

Birmingham New Street Phase 2: Enhanced Project Delivery through Early Consultancy

Birmingham

coleman-group
coleman-group

CLIENT:

Network Rail

DISCIPLINE(S):

cut and lift, Deconstruction, Demolition works, dismantling, Machinery design, stakeholder collaboration, Structural Alterations, Temporary works design

LOCATION:

Birmingham

PROGRAMME:

4.5 months (18-month lead-in)

Project Overview:

This project involved the safe deconstruction of 10,000 tonnes of concrete to create the iconic atrium at the heart of Birmingham New Street’s Grand Central complex. As a leading consultancy with extensive experience in complex urban deconstruction, Colemans were brought in to advise Network Rail on all aspects of the project, from initial investigations to final execution.

Benefits of Early Consultancy Involvement:

  • Improved Project Feasibility and Cost Certainty: Early collaboration with Colemans allowed for a thorough structural assessment, leading to a more accurate and cost-effective deconstruction plan. This minimized potential surprises or delays during execution. 
  • Innovative Solutions for Complex Challenges: The project demanded the removal of massive concrete sections within a live station and shopping centre. Colemans’ expertise facilitated the development of a bespoke solution – the award-winning “Mega Muncher” – a remote-controlled deconstruction excavator specifically designed for this project. 
  • Optimised Programme Delivery: Through lean principles and collaborative planning, Colemans streamlined the deconstruction sequence, significantly reducing the project timeline from 12 months to a remarkable 4.5 months. 
  • Enhanced Safety and Risk Management: Colemans experience in safe deconstruction practices ensured a risk-free execution. The project achieved zero accidents or incidents, showcasing a commitment to worker and public safety. 
  • Award-Winning Excellence: The project’s success was recognized by the industry with four prestigious awards at the World Demolition Awards, including the coveted “Best of the Best” accolade. 

Experience Brought to Bear:

  • Structural Engineering Expertise: Thorough structural assessments and innovative temporary works design ensured the safe and efficient removal of the extensive and difficult to remove concrete elements. 
  • Complex Deconstruction Planning: Colemans experience in intricate urban environments facilitated the development of a meticulously planned deconstruction methodology, minimising disruption to surrounding infrastructure. 
  • Collaborative Project Management: Strong communication and collaboration with Network Rail and other stakeholders ensured a smooth execution process. 
  • Advanced Deconstruction Technology: The project pioneered the design and implementation of the “Mega Muncher,” a testament to Colemans commitment to developing innovative solutions. 

Conclusion:

By engaging Colemans as a consultant early in the project, Network Rail benefited from a comprehensive approach that addressed all aspects of deconstruction planning, design, and execution. This resulted in a safer, faster, and more cost-effective project, ultimately delivering an award-winning outcome that transformed Birmingham New Street into a modern transportation hub.

coleman-group
The international awards we received for this project say more than any of us could. This was an extremely complicated project, in challenging conditions, recognised at the very highest level in our industry.
Colemans Project Team

AWARD - WINNING PROJECT

coleman-group

How can we help?

Want to talk to us about a project or invite us to tender, fill in your details below.